September 29, 2009
to September 30, 2009
8:30am - 3:30pm
Details:
Face to face meeting of the Water Quality Goal Implementation Team in Lancaster, PA.
Related Files:
Agenda (45.16 KB)
Meeting Logistics (19.87 KB)
Chesapeake Bay TMDL “Parking Lot Issues” (30.43 KB)
Map: Drainage to 92 Tidal Segments (1.8 MB)
Critical Period for the Chesapeake Bay TMDL (115.46 KB)
Methods to Determine Critical Period (73.6 KB)
Tech Memo on CBPO Critical Period Analysis (27.44 KB)
DO Stoplight Detailed Reference Curve (132.99 KB)
Changes to the Draft Basinwide Nutrient Target (148.18 KB)
Target Loads Options (abridged) (229.92 KB)
EO 202a Water Quality Draft Report (1.58 MB)
Scenario Builder Update (895.9 KB)
Chesapeake Bay TMDL Strawman Outline (91.17 KB)
Public Outreach Overview (14.3 KB) The information on this Calendar regarding Chesapeake Bay Program meetings and events is accurate to the best of our knowledge.