Basinwide BMP Verification Framework Document
Description
Revised final draft of the Chespeake Bay Basinwide BMP Verification Framwork document, updated in August 2014 for review by the Management Board. Supporting documentation provided as Appendices A-U.
Project Resources
- BMP verification framework final draft for mb review 08112014 [PDF, 1.8 MB]
- BMP verification framework document with all appendices [PDF, 34.7 MB]
- All appendices (A-U) [PDF, 33.4 MB]
- Appendix a--bmp verification principles [PDF, 341.7 KB]
- Appendix b--combined sector-habitat bmp verification guidance [PDF, 3.0 MB]
- Appendix c--bmp verification review panel charge and members [PDF, 500.9 KB]
- Appendix d--cbp bmp verif review panel recommendations 11 19 2013 [PDF, 627.9 KB]
- Appendix e--ensuring full access to federal conservation practice data [PDF, 391.0 KB]
- Appendix f--usgs hively et al 2013 [PDF, 2.5 MB]
- Appendix g--enhance collection and reporting of cost shared practices [PDF, 295.5 KB]
- Appendix h--cbp resource improvement practice definitions and visual indicators document 8-8-14 [PDF, 3.4 MB]
- Appendix i-placeholder [PDF, 82.2 KB]
- Appendix j--acknowledgments [PDF, 78.3 KB]
- Appendix k--list of cbp groups [PDF, 165.4 KB]
- Appendix l--building the basinwide framework [PDF, 550.6 KB]
- Appendix m--partnership process for development of the basinwide bmp verification framework [PDF, 402.5 KB]
- Appendix n--record of cbp meetings and teleconferences including bmp verification [PDF, 139.9 KB]
- Appendix o--verification guidance development and review process [PDF, 471.1 KB]
- Appendix p--relative load reductions analysis 02112014 [PDF, 681.3 KB]
- Appendix q--nps bmp qapp-guidance 8-11-14 [PDF, 1.1 MB]
- Appendix r--eo13508 [PDF, 1.3 MB]
- Appendix s--nrc 2011 report chatper on bmp tracking and accountability [PDF, 790.4 KB]
- Appendix t--cac correspondence combined [PDF, 25.8 MB]
- Appendix u--draft stac verification oversight subgroup 16aug2013 [PDF, 1.6 MB]