Phase 6 Model and Midpoint Assessment
Description
This project page is the repository for the Phase 6 model, its documentation, as well as files and links to Tableau pages. Please email Kyle Hinson (khinson@chesapeakebay.net) with any questions you may have.
Documentation
All documentation files will be uploaded to this FTP site to assist in partnership review of Phase 6: https://archive.chesapeakebay.net/?prefix=Modeling/Phase6/Draft_Phase_6/Documentation/
Calibration
A summary PDF of calibration results has been generated and is available for download (large file): https://archive.chesapeakebay.net/Modeling/Phase6/Draft_Phase_6/Watershed_Model/WSM_Outputs/Calibration_Figures/00_Calibration_Figures_All_Phase6Draft.pdf
Other detailed calibration results for each calibrated parameter and river segment can be found in a separate FTP folder: https://archive.chesapeakebay.net/?prefix=Modeling/Phase6/Draft_Phase_6/Watershed_Model/WSM_Outputs/Calibration_Figures/
Further detailed calibrated output for the watesrhed can be found in csv files located at this FTP site: https://archive.chesapeakebay.net/?prefix=Modeling/Phase6/Draft_Phase_6/Watershed_Model/WSM_Outputs/Summary_Loads/
Further comparisons between the Watershed Model and WRTDS can be found at the non-tidal dashboard. These visual representations show both the loads estimated from monitoring data (WRTDS) and loads estimated from the Draft Phase 6 Model: http://cast-beta.chesapeakebay.net/documentation/NonTidalWaterQualityDashboard
Land use files can be found at this ftp site: https://archive.chesapeakebay.net/?prefix=Modeling/Phase6/Draft_Phase_6/Land_Use/
Watershed Model Inputs
Links to the sites for Watershed Model Inputs can be found at these web pages:
FAQ regarding Modeling Tools: https://mpa.chesapeakebay.net/Phase6FAQ.html
Graphical Interface for Phase 6 Model Inputs: https://mpa.chesapeakebay.net/Phase6DataVisualization.html
CAST Homepage: http://cast.chesapeakebay.net/
Phase 6 Soil Phosphorus Figures: https://archive.chesapeakebay.net/Modeling/soil-p-history/fig/
Model Review Process
The process by which the partnership can most effectively submit comments and provide feedback to the development of the Phase 6 model will be outlined in a continuously updated document found below. The schedule of upcoming webinars is also provided below and in the attached document. Please contact Lewis Linker (llinker@chesapeakebay.net) or Kyle Hinson (khinson@chesapeakebay.net) with any questions.
Phase 6 Sediment Simulation Webinar: April 19, 2017, 1 PM - 3 PM (link) (recording)
Phase 6 Integrated Models and Decision Framework Overview Webinar: May 9, 2017, 1 PM - 3 PM (link) (recording)
Phase 6 Poultry Inputs Webinar: May 24, 2017, 1 PM - 3 PM (link) (recording)
Phase 6 Inputs Webinar: May 25, 2017, 1 PM - 3 PM (link) (recording)
Phase 6 Loads Webinar: June 1, 2017, 1 PM - 3 PM (link) (recording)
Phase 6 Physical Transport Webinar: June 20, 2017, 1 PM - 3 PM (link) (recording)
Project Resources
- Phase 6 Approval Process [PDF, 133.3 KB]
- Cbp phase 6 webinars 2017 [PDF, 87.6 KB]
- Agriculture Workgroup and Agricultural Modeling Subcommittee Decisions on Phase 6 Model (2015-2017) [PDF, 478.3 KB]
- Draft Phase 6 Watershed Model - Summary Statistics [PDF, 3.5 MB]
- Ph6 fatal flaw review comments updated 08252017 xlsx [XLSX, 58.0 KB]