WWTWG Small Group Materials
In ProgressThese reference materials support the Small Groups established by the Wastewater Treatment Workgroup to discuss a boat pumpout best mangement practice, combined sewer overflows and santitary sewer exfiltration.
Description
The Wastewater Treatment Workgroup has formed Small Groups to discuss the following issues: (A) Boat Pumpout Best Management Practice (BMP), (B) Combined Sewer Overflows (CSOs) and (C) Sanitary Sewer Exfiltration. This project captures reference materials for these Small Groups as were used during the development of the Phase 7 suite of models.
Boat Pump-out BMP
- Boat Pump Out BMP Expert Panel Report, July 2018
- Boat Pump Out Response to comments Presentation, November 6, 2018
- Boat Pump Out Expert Panel Presentation, July 23, 2018
- Appendix I: Comments on interim Boat Pump-Out Practices
- Appendix D: Technical Requirements for Inclusion of Boat Pump-Out Practices in the Modeling Tools
- Boat Pump Out BMP Rationale for Tabling, September 2025
- Boat Pump Out BMP Timeline of Review, September 2025
Combined Sewer Overflows (CSOs)
- Alex Renew CSS Annual Report 2023
- Alex Renew CSS Appendix A 2023
- Estimating CSO Loads in the CBP Watershed Model Presentation, July 2025
- Phase 6 CSO Loads - Figures and Table, August 2025
Sanitary Sewer Exfiltration
Project Resources
- A. Boat Pump Out BMP Expert Panel Report July 2018 [PDF, 4.3 MB]
- A. Boat Pump Out Response to comments Presentation, November 6, 2018 [PDF, 641.6 KB]
- A. Boat Pump Out Expert Panel Presentation, July 23, 2018 [PDF, 3.3 MB]
- A. Appendix I: Comments on interim Boat Pump-Out Practices [PDF, 589.3 KB]
- A. Appendix D: Technical Requirements for Inclusion of Boat Pump-Out Practices in the Modeling Tools [PDF, 800.1 KB]
- B. Alex Renew CSS Annual Report 2023 [PDF, 3.5 MB]
- B. Alex Renew CSS Appendix A 2023 [PDF, 206.8 KB]
- C. Sanitary Sewer Exfiltration Presentation J Delesantro May 5th 2024 [PPTX, 9.6 MB]
- C. Sanitary Sewer Exfiltration Presentation Feb 2024 [PDF, 4.5 MB]
- C. Grey Infrastructure Expert Panel Report October 27th 2014 [PDF, 1.7 MB]