4. Short-Term Flow-Adjusted Change
CompleteObserved change in water quality computed under the condition of average freshwater flow into the Chesapeake Bay over the last 10 years (2015-2025).
Description
Observed change in water quality computed under the condition of average freshwater flow into the Chesapeake Bay over the last 10 years (2015-2024).
Project Resources
- CHLA S Spring shortterm24 flow [PNG, 594.1 KB]
- CHLA S Summer shortterm24 flow [PNG, 596.8 KB]
- DO B Summer shortterm24 flow [PNG, 570.0 KB]
- Secchi Annual shortterm24 flow [PNG, 603.8 KB]
- TN S Annual shortterm24 flow [PNG, 581.5 KB]
- TP S Annual shortterm24 flow [PNG, 566.7 KB]
- TSS S Annual shortterm24 flow [PNG, 593.3 KB]
- WTEMP S Annual shortterm24 flow [PNG, 592.0 KB]